Technology ❯ Aerospace Technology ❯ Aircraft Design ❯ Long-Range Aircraft
The test starts a roughly two-month, 80-hour campaign to validate a 20,000-litre rear centre fuel tank plus galley cooling and ventilation systems ahead of deliveries moved to April 2027.