Haverhill Bypass Stops Sewage Flow After 42‑Inch Pipe Break
A temporary bypass stopped daily discharges to the Merrimack River, enabling phased beach reopenings, ongoing water testing, inspections of the damaged 42‑inch main and planning for months of repairs.