Overview
- WattEV announced the 370-truck purchase Tuesday at the ACT Expo in Las Vegas.
- More than 300 trucks will run in a joint program with the Port of Oakland to electrify drayage and regional routes.
- Deliveries start with 50 trucks in 2026, with the entire fleet targeted to be in service by the end of 2027.
- WattEV is building megawatt-class charging hubs in Oakland, Fresno, Stockton, and Sacramento that can add about 300 miles of range in roughly 30 minutes.
- The order follows the first Semi off Tesla’s high-volume Nevada line last week, indicating demand as production ramps.