Overview
- Walt Disney Imagineering filed a Notice of Commencement on March 3–4 listing Scenario to "install set elements" inside the Encanto show building at 504 Dinoland Drive.
- The permit confirms the project is moving from steel and roof work into interior scenic fit-out, with the building topped off and queue framing underway.
- The filing carries a one-year window from its date, indicating this phase of installation is expected to wrap by early March 2027.
- Scenario previously delivered high-detail scenic work for Star Wars: Galaxy’s Edge and Rise of the Resistance, underscoring the emphasis on immersive finishes.
- Disney says the Encanto dark ride will bring guests into Casa Madrigal the day after Antonio receives his gift, as the wider Tropical Americas adds an Indiana Jones reimagining, a carved-animal carousel now in foundation work, and the Pueblo Esperanza plaza.