Particle.news
Download on the App Store

Universal Reopens Lost Continent–Seuss Landing Bridge as Jurassic Park–Hogsmeade Link Closes for Refurbishment

Phased maintenance keeps key walkways safe and themed, with detours temporarily shifting foot traffic through The Lost Continent.

Overview

  • The Lost Continent–Seuss Landing bridge is fully reopened after a months-long refurbishment, with all construction barriers removed.
  • The project added wood plank-style flooring, refreshed railings, and lantern-style lighting to improve durability and theming.
  • The bridge connecting Jurassic Park and Hogsmeade is currently closed behind construction walls and wrapped in scaffolding and scrim.
  • Guests traveling between Jurassic Park and the Wizarding World area are being routed via the VelociCoaster pathway through The Lost Continent.
  • The changes reflect Universal’s staggered upkeep of heavily used infrastructure that supports safety, guest flow, and immersive presentation.