Particle.news
Download on the App Store

Uffizi Launches €50 Million, Two‑Year Renovation of Florentine Complex

Funded by the culture ministry plus private donors, the program upgrades climate control, rehung displays, reconfigures public spaces to protect artworks, ease visitor flow, keep the museum open during works.

Overview

  • The Uffizi has launched a coordinated nearly €50 million program that will run about two years and cover the Uffizi Galleries, the Palazzo Pitti, and the Boboli Gardens.
  • Funding comes from Italy’s Ministry of Culture with private contributions that include a reported €5 million donation from philanthropist Veronika Atkins.
  • Planned technical work includes a major climate-control overhaul with two new cooling towers to protect paintings from heat and humidity stress.
  • Visitor-focused changes will rehung major galleries, install new cases, lighting and labels, create a new reception and convert Pitti spaces into additional exhibition areas to reduce crowding.
  • Site-specific projects already under way or planned include the reopened Botticelli Rooms, restoration of the Boboli amphitheater and fountains, and a curatorial redesign of the Gallery of Statues and Paintings.