Particle.news
Download on the App Store

Tower of Terror Begins Quiet Queue Refurbishment at Disney’s Hollywood Studios

A new permit lists MLC Theming for general construction on the attraction.

Overview

  • Guests reported work on the outside queue columns near the entrance, with lower sections covered in scrim.
  • The queue remains open, though future phases could require line reroutes as crews progress along the facade.
  • Public records show a permit that names MLC Theming as the contractor and describes the scope as general construction.
  • Disney has not announced closures or a schedule, reflecting past rolling work that cut capacity and lengthened waits in 2023.
  • The ride continues to operate at Hollywood Studios and also has a version in Disneyland Paris, and any capacity limits in Florida would most affect families relying on standby lines.