Particle.news
Download on the App Store

Telangana Invites Design Bids to Rehabilitate Kaleshwaram’s Medigadda, Annaram and Sundilla Barrages

The call for proposals follows dam-safety findings urging outside expertise with central review.

Overview

  • The Irrigation and Command Area Development Department’s Central Designs Organisation issued an EOI for rehabilitation and restoration designs, with proposals due October 15 at the Chief Engineer’s office in Hyderabad.
  • The National Dam Safety Authority’s final report recommended full rehabilitation designs for all three barrages after identifying issues such as sand piping, cavity formation and design flaws, with a preference for Central Water Commission review.
  • The Central Designs Organisation has stated it lacks the capacity to prepare the required repair designs, leading the state to seek empanelled external design agencies.
  • Officials plan geotechnical and geophysical investigations during the current low-flow window on the Godavari, with the goal of taking up repair work next summer when river levels are lowest.
  • The move comes as the Ghose Commission’s findings prompted a planned CBI probe, while opposition figures, farmers and activist V Prakash Rao criticize the step as delayed and contend that only the damaged Medigadda block should be rebuilt under L&T’s contractual obligations.