Particle.news
Download on the App Store

Railways Clears Final Location Survey for 14 km Jirania–Bodhjungnagar Link

The approved survey will assess technical requirements ahead of any construction decision.

Overview

  • The Ministry of Railways sanctioned a final location survey for a proposed rail line connecting Jirania rail yard to Bodhjungnagar Industrial Complex in West Tripura.
  • The Northeast Frontier Railway said the survey is estimated at Rs 42 lakh and will cover a 14 km stretch.
  • NFR’s CPRO said engineers will examine terrain, soil conditions, bridge needs and related design parameters, then submit a report to the ministry.
  • Tripura Transport Minister Sushanta Chowdhury welcomed the move and thanked the prime minister, the railway minister and the chief minister.
  • Officials describe the link as a future freight corridor serving the 535-acre Bodhjungnagar hub, with potential benefits for local industry and supply chains if the project proceeds.