Overview
- A supply agreement announced Tuesday between Parliament Energy and Ideematec covers 1.2 GWac of Horizon L:TEC 1P trackers for three Texas solar projects.
- The three sites are part of Parliament Energy’s 2.1 GWac portfolio and range from about 285 MWac to 505 MWac across the state.
- Tracker installation begins next at the 505 MWac Tehuacana Creek Solar project south of Dallas, with the other two projects slated to start in mid‑2026.
- Ideematec highlights CPP‑verified resistance to winds up to 224 mph, a decoupled drive that isolates rows, and a hail stow position designed to protect panels during storms.
- The agreement builds on a 480 MWac project near Houston that entered service in June 2025, with Parliament Energy backed by sponsors EnCap Investments and Mercuria Energy.