Overview
- Terminals will adopt single-digit identifiers that follow the road and RER arrival flow, with Terminal 1 keeping its name and subsequent buildings numbered in ascending order to 7.
- Examples provided by ADP include today’s 2E becoming 5 and 2F becoming 6, while post-security boarding areas will be labeled with letters.
- The timing is set to align with the planned launch of the CDG Express rail link to Gare de l’Est, advertised as a 20‑minute ride departing every 15 minutes.
- ADP estimates a major signage overhaul with about 3,000 panels in terminals, 600 in parking areas, and 250 road signs to be replaced or added.
- After a public consultation of roughly 17,000 participants, ADP’s CEO is presenting the plan to partners as broader intermodal work advances, including IDFM’s March 1, 2026 Roissybus replacement and coordination with rail operators, with a potential CDGVAL link to 2G under study.