Particle.news
Download on the App Store

Painted Mayan Pyramid Sections Installed at Indiana Jones Attraction

Off‑site‑sculpted Mayan facade sections were craned into place to speed on‑site finishing and compress the build schedule.

Overview

  • Photos posted Sept. 4 show two large, fully painted Mayan pyramid sections were lifted into place at the Indiana Jones site inside the Tropical Americas build area.
  • Disney has officially named the ride Indiana Jones and the Myth of the Jade Serpent and released the story framework of a Mayan temple, a portal into the underworld, and a guarding creature called the Tsukán.
  • Disney confirmed the attraction will include an Indiana Jones Audio‑Animatronic modeled on Harrison Ford, and outlets report production on animatronics and ride vehicles is already underway.
  • Walt Disney Imagineering prefabricated the detailed facade pieces backstage, a move that lets sculpting and painting happen off‑site while crews continue steel framing and rockwork at the build site.
  • Disney is targeting a 2027 rollout but has not announced an official opening date, so the recent facade installation raises the likelihood of a phased 2027 into 2028 opening and signals more timetable updates are likely as work continues.