Overview
- Aerial photos from March 18 show the curving main hotel along the Bay Lake shoreline with visible roofing and exterior progress.
- A bus shelter frame is now in place near the resort’s arrival area, indicating movement toward operational infrastructure.
- The pool complex is forming, with the lazy river under construction; a photographer described the layout as horseshoe‑shaped rather than a full loop.
- Ground and water views show A‑frame cabins along Clementine Beach beginning to receive roofs.
- The angular entrance porte cochere is receiving additional concrete reinforcement as site work advances.