Overview
- Fresh aerial photos show multi-layer concrete pours, rebar grids, and conduit installation progressing for the Monsters, Inc. suspended coaster’s show building behind the park.
- Extensive scaffolding and stripped facades are visible across the former Muppets Courtyard, including at the ex–Gonzo’s Royal Flush area, PizzeRizzo, and the Muppet*Vision 3D theater.
- Staged streetlamp-style lighting and four newly dug square holes outside the former PizzeRizzo patio point to upcoming infrastructure work.
- Disney previously described the door-vault attraction as its first suspended coaster and first vertical-lift coaster for Walt Disney World.
- In a separate project, the new Walt Disney Studios Courtyard elsewhere in the park is slated to open on May 26, 2026, with exterior work visibly nearing completion.