Particle.news
Download on the App Store

Maharashtra Says Only Two Potholes Found on New PuneMumbai Missing Link as Monsoon Hits

MSRDC has been ordered to inspect and repair any surface defects on the 13.3 km link.

Overview

  • Maharashtra Chief Minister Devendra Fadnavis said on Saturday that only two potholes had been noticed on the Rs 7,181 crore, 13.3 km PuneMumbai Missing Link and rejected claims of widespread deterioration.
  • Officials described the early monsoon as a routine durability test for newly laid surfaces and said final road treatments are often completed after the rains.
  • MSRDC and contractors have reported the potholes were small, that repairs were carried out near an expansion joint, and that the project remains under defect liability so no penalty has been imposed yet.
  • The India Meteorological Department issued very heavy rain forecasts and a red alert for Mumbai through July 6, prompting NDRF, SDRF and state disaster teams to monitor conditions and advise people to avoid nonessential travel.
  • The Missing Link bypasses the Khandala Ghat to cut about 30 minutes off PuneMumbai travel and features large bridges and a tunnel under a dam, which officials highlight as significant engineering achievements that will continue to be monitored and maintained.