Particle.news
Download on the App Store

Madrid Region Fire Crews Contain Two Industrial Blazes Within 24 Hours

Rapid intervention by regional firefighters contained both blazes without casualties.

Overview

  • A recycling plant in Torrejón de Velasco reported a major fire in two piles of processed scrap, drawing 12 fire crews who brought it under control and kept it confined.
  • Firefighters are still removing and cooling about 1,500 cubic meters of scrap to prevent reignition, and emergency medics stayed on site in a preventive role.
  • Concrete block partitions at the facility and quick hose lines stopped the flames from spreading into a third sector, which limited damage to the plant.
  • Hours earlier, a truck workshop fire in San Fernando de Henares torched three vehicles but was kept to about 250 square meters of a 1,500‑square‑meter building after 10 units responded.
  • Regional emergency services coordinated both operations and reported no injuries, and officials have not disclosed the causes of either blaze in this short cluster of industrial fires.