Overview
- The line between Brockenhurst and Lymington Pier is shut, with replacement road transport maintaining services during the closure.
- Rail replacement buses run every 30 minutes on Saturday and every 60 minutes on Sunday.
- The closure follows a minor landslip near Battramsley after heavy rainfall associated with Storm Goretti.
- Engineers are working around the clock to install a steel wall and rebuild the embankment as a long‑term fix.
- Once repairs are complete, trains will resume at one per hour before a monitored return to the normal timetable.