Particle.news
Download on the App Store

Kia Georgia Starts 2027 Telluride Hybrid Production as West Point Plant Hits 5 Million Vehicles

The milestone highlights the factory's shift to a broader powertrain mix.

Overview

  • West Point, Georgia, began assembling the 2027 Telluride HEV, the first hybrid built in the state and Kia’s first U.S.-assembled HEV.
  • The plant marked its 5 millionth vehicle with a ceremonial Telluride attended by Governor Brian Kemp, Kia leadership, and community officials.
  • Kia says West Point is the only plant worldwide that builds the Telluride, which has been produced exclusively in Georgia since 2019.
  • The facility has annual capacity of about 350,000 units and builds Telluride, Sorento, Sportage, plus the all-electric EV9 and EV6.
  • Company statements frame the dual milestones as proof of continued investment, innovation, and workforce strength in Georgia manufacturing.