Particle.news
Download on the App Store

Gran Hermano Removes Its Iconic Pool as Part of House Overhaul

The host confirmed the pool’s removal on Instagram, signaling a broader redesign of the Martínez set.

Overview

  • On December 23, Santiago del Moro shared images of the backyard under construction with a large pit where the pool previously stood.
  • Telefe is executing wider structural changes to refresh the house, with the final layout and any format adjustments not yet detailed.
  • The pool has long been a focal point of past seasons, and its absence raises questions about how interactions and challenges will be staged.
  • Casting for Gran Hermano: Generación Dorada is underway, and local outlets report plans for a February 2026 launch.
  • No replacement feature has been announced for the pool area, and online speculation cited by media remains unconfirmed.