Overview
- Walt Disney World filed a Notice of Commencement on February 18 for “General Construction” at 2221C Orleans Dr, the splash‑pad and water play area at Port Orleans – French Quarter.
- The filing was submitted by Disney’s Facility Asset Management rather than Walt Disney Imagineering, indicating maintenance work rather than a redesign.
- Listed contractor Vermana is known for pool resurfacing and electrical and mechanical repairs, reinforcing the refurbishment focus.
- Disney has not announced any closures, though a temporary splash‑pad shutdown is possible once work starts.
- The nearby Doubloon Lagoon pool underwent a major refurbishment in 2024 and is not expected to be affected, and Port Orleans – Riverside is outside the scope.