Particle.news
Download on the App Store

Disney Adventure Installs Three-Deck Storybook Castle, a First for Disney Cruise Line

The installation signals steady outfitting progress before the ship’s March 10, 2026 debut from Singapore.

Overview

  • Walt Disney Imagineering placed the three-deck-tall Storybook Castle in the Imagination Garden, delivering the fleet’s first Disney castle at sea.
  • The pop-up storybook design features the Disney family crest, a waterfall base, and stained-glass panels referencing Moana, Tangled, and Frozen.
  • Disney says the ship remains in final outfitting in Wismar with additional elements still to come, including four funnels and planned attractions like Groot Galaxy Spin and the Ironcycle Test Run coaster.
  • The Singapore-based vessel will launch with nearly 17,000 square feet of retail space, including World of Disney, a National Geographic Store, and the first dedicated Duffy and Friends shop on the line.
  • The rescheduled maiden voyage departs Singapore on March 10, 2026, with bookings open for the revised inaugural sailings.