Overview
- The vessel is scheduled to leave Mumbai on January 20 and reach Delhi in three to four days for engine installation.
- Tourism Minister Kapil Mishra says final technical work will follow arrival, with a February launch targeted and Chief Minister Rekha Gupta expected to inaugurate.
- Operations are planned over a 6–7 km corridor between Sonia Vihar and Jagatpur on National Waterway-110, offering roughly hourlong round trips.
- Boats use electric–solar hybrid propulsion with seating for about 30–40 passengers, and two floating jetties have already been installed at Sonia Vihar.
- The project is budgeted at around Rs 20 crore, with onboard food and entertainment, future water sports, and planned DTC links to nearby metro stations.