Chicago Resumes Spring Bridge Lifts Wednesday
Brief, scheduled lifts let recreational boats move through downtown with minimal traffic delays.
Overview
- CDOT, which restarts the seasonal bridge lifts Wednesday, will raise 27 movable bridges from South Ashland Avenue to DuSable Lake Shore Drive.
- The lifts run twice a week with 9 a.m. starts on Wednesdays and 8 a.m. starts on Saturdays.
- Crews raise one bridge at a time, and each opening lasts about 8 to 12 minutes.
- The spring schedule continues through June 24, with no lifts on May 23 or June 20.
- Road traffic stops during each lift, so drivers may wait or use other routes until the bridge lowers.